Lowestoft, Suffolk

  • ClientWaveney District Council

  • LocationLowestoft, Suffolk

  • Project InformationThe project involved 2 subsiding semidetached bungalows belonging to Waveney District Council. We installed 87 150mm diameter case driven piles to varying depths of 3-6 metres.

    We then knocked pockets in all of the external walls and the party wall to accommodate the reinforced needles. The 2 bungalows were having extensions on both corners for new bedrooms, which were also piled. Reinforcing bars were then laid in both directions, top and bottom of a 250mm thick concrete floor that was then poured.